Stock on the subfloor
Compressed kraft-faced batt packages stay on clean plywood until the next wall is opened. We count packages on the ticket and do not stage foam drums in the same bay.
When the wall is ready, a package is opened at the studs so the facing can go toward the conditioned side and the cut can meet the electrical box.